They also did more trim work outside including the vertical siding over the door... |
And over the arch on the front of the porch. |
Then the sections were assembled and and installed between the posts. The railings are made from heavy-duty PVC reinforced with a metal core for strength. |
The electrician completed work on the subpanel and wiring, and we passed the electrical inspection. |
With electrical inspection done, they started on the ceiling to cover up the wiring. The ceiling is fir and will be stained. |
There is unusually warm weather forecast for next week, so they are hoping to get everything done for painting then. That may mean extra work this weekend for them and us. We thought we had until spring to pick out colors, but those decisions have to be made this weekend. Right now we are deciding between 15 colors of beige trying to match the siding on the house. And an accent color to go in a couple of places. We're not sure about the color we'll have the ceiling stained. But tomorrow while I'm at work, Ward is buying some stain to try out.
We're almost there!
Until next time...
In case you missed the other installments:
And So It Begins
Porch Building, Week 2
Porch Building, Week 3
Porch Building, Weeks 4, 5, 6
Porch Update, Weeks 7, 8
Porch Update, Weeks 9, 10
Porch Update, Week 11